Demonstration plant Design and Construction
Construction of Ultrapure Water Demonstration Plant
- Ultrapure water R&D, demo plants, and top-grade supply
- ’21~’25: 100% domestic build, 70% core part localization
- Demo plants to verify local tech and reduce imports
| Facility | 2,400㎥/day |
|---|---|
| Cost | 44.3 billion KRW |
| Location | SK Siltron, Gumi Plant 2, ultrapure water production building (4 floors, 390 pyeong) |
Core Components Key Equipment
-
UV Oxidation
-
Degassing Membrane
-
Ion Exchange Resin
Development of Ultrapure Water Infrastructure
- World-class water quality lab setup
- Ultrapure analysis, ppq (10-15) level, cleanroom (Class 1–100)
- Ultrapure platform center by 2030
- Support for testing, R&D, talent, and businesses
The 'Ultra-Pure Water Platform Center,' enabling collaboration among organizations like the 'Ministry of Climate, Energy and Environment', K-water, and research institutions, aims for completion by 2030.
* Supporting semiconductor production and yields through ultra-pure water growth and ecosystem development.
- T/B provision, technology verification
- Water quality analysis
- Use of verified products, production and testing of ultrapure water
- Development of technology to improve wastewater reuse rate
- Performance certification, R&D, talent traning, corporate support