Hydrothermal Energy

    • SiteLotte World Tower
    • Heat SourceRegional water (Metro Area I)
    • Capacity3,000 RT (50,000 tons/day)
    • StatusCompleted (`15.01 ~ `34.12)
    • SiteBusan EDC Smart Village
    • Heat SourceRiver water (Pyeonggangcheon)
    • Capacity150 RT (2,800 tons/day)
    • StatusCompleted (`22.02 ~ )
    • SiteHan River Flood Control Center
    • Heat SourceRegional water (Metro Area I)
    • Capacity100 RT (1,800 tons/day)
    • StatusCompleted (`21.04 ~ `40.03)
    • SiteHan River Water Institute
    • Heat Source`20.10 ∼ `21.6 (Completed)
    • Capacity60 RT (River water)
    • StatusCompleted (`15.01 ~ `34.12)
    • SiteGangwon Hydrothermal Cluster
    • Heat SourceLake water (Soyanggang Dam)
    • Capacity16,500 RT (240,000 tons/day)
    • StatusConstruction start (`23.12)
    • SiteSinbangcho
    • Heat Source`23.12
    • Capacity60 RT (Regional pipeline)
맨 위로